OPERATIONAL VALIDATION OF SPACE-ENABLED RAIL BUCKLING RISK MONITORING IN THE SPATRA RAILWAY PILOT

Other Railway Aspects15–16 October 2026 · Niš, Serbia

Authors

Danijela RISTIĆ-DURRANT1
iD0000-0001-9811-6615
Alina KLAPPER3
Dietrich KUHN4
Miloš SIMONOVIĆ5
iD0000-0003-1364-7746
Miloš MADIĆ6
iD0000-0002-2310-2590
Milan TRIFUNOVIĆ7
iD0000-0002-4653-6957

Affiliations

  1. 1OHB Digital Services GmbH, Konrad-Zuse-Str. 8, 28359 Bremen, Germany, danijela.ristic-durrant@ohb-ds.de
  2. 2University of Niš, Faculty of Mechanical Engineering in Niš, Aleksandra Medvedeva 14, 18104 Niš, Serbia, milan.banic@masfak.ni.ac.rs
  3. 3OHB Digital Services GmbH, Konrad-Zuse-Str. 8, 28359 Bremen, Germany, alina.klapper@ohb-ds.de
  4. 4OHB Digital Services GmbH, Konrad-Zuse-Str. 8, 28359 Bremen, Germany, dietrich.kuhn@ohb-ds.de
  5. 5University of Niš, Faculty of Mechanical Engineering in Niš, Aleksandra Medvedeva 14, 18104 Niš, Serbia, milos.simonovic@masfak.ni.ac.rs
  6. 6University of Niš, Faculty of Mechanical Engineering in Niš, Aleksandra Medvedeva 14, 18104 Niš, Serbia, milos.madic@masfak.ni.ac.rs
  7. 7University of Niš, Faculty of Mechanical Engineering in Niš, Aleksandra Medvedeva 14, 18104 Niš, Serbia, milan.trifunovic@masfak.ni.ac.rs
RESEARCH OVERVIEW

Abstract

SPATRA project developed and demonstrated a Railway Pilot (RWP) that combines Earth Observation (EO)-derived land-surface temperature, meteorological forecasts, in-situ rail and environmental measurements, and track data to predict rail-track temperature and heat-related buckling risk. This paper summarises the integrated rail-pilot results. The RWP was operated from 1 July to 31 August 2025 on a 22 km Red Cross-Jasenovik section of the Niš-Svrljig line. The reported pilot results showed that 15 of 17 rail-temperature predictions were within ±5 °C of in-situ measurements. Retrospective analysis of 22 hot-weather slow-order days indicates that risk-based restriction windows would reduce slow-speed operation from 264 to 146 h, a reduction of 118 h (about 45%). The system also identified the documented 24 July 2025 buckling location as high risk in advance. After interface refinements, all user-oriented KPIs exceeded 90% satisfaction, with section scores between 4.64 and 4.90/5. The results support more targeted speed restrictions, inspection prioritisation and traceable hot-weather decision-making, while wider deployment requires sustained sensor coverage, up-to-date asset data and integration with Railway Infrastructure Manager procedures.

Keywords

Railwaysheat-related bucklingEarth Observationrail track temperaturedecision support

Cite this paper

Danijela RISTIĆ-DURRANT, Milan BANIĆ, Alina KLAPPER, Dietrich KUHN, Miloš SIMONOVIĆ, Miloš MADIĆ, Milan TRIFUNOVIĆ. (2026). OPERATIONAL VALIDATION OF SPACE-ENABLED RAIL BUCKLING RISK MONITORING IN THE SPATRA RAILWAY PILOT. RAILCON ’26 — XXII International Scientific-Expert Conference on Railways, Niš, Serbia, pp. 139–142. https://doi.org/10.46793/railcon26.139RD